aKode fase 5: rinomina interna (crate akode-*, akode-rs/, akode-cli/, binario akode, AKODE_*, ~/.akode, snapshot)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
andrea.difonzo
2026-11-11 11:06:46 +01:00
parent df99318392
commit 86e7c72e5f
10383 changed files with 749164 additions and 749170 deletions

View File

@@ -0,0 +1,235 @@
//! Persistent dependency paths and exclusive attribution over the observed turn interval.
//! History is depth-limited; formatting and destruction never recurse through the chain.
use std::sync::Arc;
use std::time::Duration;
use std::time::Instant;
mod review_execution;
pub use review_execution::ReviewExecution;
pub use review_execution::ReviewExecutionAttempt;
const MAX_PATH_DEPTH: usize = 16_384;
/// Category attributed to an observed segment of dependency work.
#[derive(Clone, Copy, Debug)]
pub enum WorkKind {
/// Model sampling work on the selected dependency path.
Sampling,
/// Compaction work, including its local bookkeeping.
Compaction,
/// Automatic review work, such as reviewing a tool call before execution.
AutoReview,
/// Time awaiting a human answer or approval on the selected dependency path.
UserWait,
/// Tool execution work, including work after a dependency join resumes.
/// This is an aggregate category; tool-specific subtypes such as browser or
/// computer use are not represented by this calculator.
Tools,
/// Time within the observed turn interval not covered by a recorded work segment.
Overhead,
/// Work whose category is unavailable, including history collapsed at the depth limit.
Unknown,
}
/// A persistent observed dependency path. Review observers must be sealed before
/// publishing completed paths. Forks share their prefix; a join
/// retains only the dependency that actually released the waiting operation.
/// Equality compares path identity rather than the contents of each segment.
#[derive(Clone, Default)]
pub struct CriticalPath(Option<Arc<Node>>);
impl std::fmt::Debug for CriticalPath {
fn fmt(&self, f: &mut std::fmt::Formatter<'_>) -> std::fmt::Result {
// Summarize the tail without traversing shared dependency history.
f.debug_struct("CriticalPath")
.field("depth", &self.0.as_ref().map_or(0, |node| node.depth))
.field("end", &self.end())
.finish()
}
}
impl PartialEq for CriticalPath {
fn eq(&self, other: &Self) -> bool {
match (&self.0, &other.0) {
(Some(left), Some(right)) => Arc::ptr_eq(left, right),
(None, None) => true,
(Some(_), None) | (None, Some(_)) => false,
}
}
}
impl Eq for CriticalPath {}
struct Node {
previous: CriticalPath,
kind: WorkKind,
reviews: Vec<ReviewExecution>,
start: Instant,
end: Instant,
origin: Instant,
depth: usize,
}
/// Exclusive time attributed to each category within the requested interval.
#[derive(Debug, PartialEq, Eq)]
pub struct PathDurations {
pub sampling: Duration,
pub compaction: Duration,
pub auto_review: Duration,
/// Subcomponent of auto_review excluding the union of observed child execution.
/// None means review attribution or dependency history is incomplete.
pub auto_review_overhead: Option<Duration>,
pub user_wait: Duration,
pub tools: Duration,
pub overhead: Duration,
pub unknown: Duration,
}
impl Default for PathDurations {
fn default() -> Self {
Self {
sampling: Duration::ZERO,
compaction: Duration::ZERO,
auto_review: Duration::ZERO,
auto_review_overhead: Some(Duration::ZERO),
user_wait: Duration::ZERO,
tools: Duration::ZERO,
overhead: Duration::ZERO,
unknown: Duration::ZERO,
}
}
}
impl PathDurations {
fn record(&mut self, kind: WorkKind, duration: Duration) {
if matches!(kind, WorkKind::Unknown) {
self.auto_review_overhead = None;
}
let total = match kind {
WorkKind::Sampling => &mut self.sampling,
WorkKind::Compaction => &mut self.compaction,
WorkKind::AutoReview => &mut self.auto_review,
WorkKind::UserWait => &mut self.user_wait,
WorkKind::Tools => &mut self.tools,
WorkKind::Overhead => &mut self.overhead,
WorkKind::Unknown => &mut self.unknown,
};
*total = total.saturating_add(duration);
}
}
impl CriticalPath {
/// End of the last recorded segment, or `None` for an empty path.
pub fn end(&self) -> Option<Instant> {
self.0.as_ref().map(|node| node.end)
}
/// Retain the later-finishing path, choosing `self` on a tie.
pub fn latest(self, other: Self) -> Self {
if other.end() > self.end() {
other
} else {
self
}
}
/// Append work after the existing path ends, clipping overlap and ignoring empty segments.
/// Exceeding the history limit collapses the retained interval into unknown work.
pub fn work(self, start: Instant, end: Instant, kind: WorkKind) -> Self {
self.append(start, end, kind, Vec::new())
}
/// Adds review time with the exact reviews active during this segment. Their
/// child execution union is clipped to the segment and requested window.
pub fn auto_review(self, start: Instant, end: Instant, reviews: Vec<ReviewExecution>) -> Self {
self.append(start, end, WorkKind::AutoReview, reviews)
}
fn append(
self,
start: Instant,
end: Instant,
kind: WorkKind,
reviews: Vec<ReviewExecution>,
) -> Self {
let start = self.end().map_or(start, |previous| previous.max(start));
if start >= end {
return self;
}
let origin = self.0.as_ref().map_or(start, |node| node.origin);
let previous_depth = self.0.as_ref().map_or(0, |node| node.depth);
let depth = previous_depth + 1;
if depth > MAX_PATH_DEPTH {
return Self::default().work(origin, end, WorkKind::Unknown);
}
Self(Some(Arc::new(Node {
previous: self,
kind,
reviews,
start,
end,
origin,
depth,
})))
}
/// Select the full branch that released this join, not just its exposed
/// waiting tail. Both branches carry their common causal prefix.
pub fn join(self, start: Instant, end: Instant, dependency: Self) -> Self {
let path = self.latest(dependency);
let resumed_at = path.end().unwrap_or(start).max(start);
path.work(resumed_at, end, WorkKind::Tools)
}
/// Attribute the requested interval exclusively, counting unrecorded gaps as overhead.
pub fn durations(&self, start: Instant, end: Instant) -> PathDurations {
let mut totals = PathDurations::default();
let mut path = self;
let mut end = end;
while let Some(node) = path.0.as_ref() {
if end <= start {
break;
}
let segment_end = end.min(node.end);
let segment_start = start.max(node.start);
if end > node.end {
totals.record(WorkKind::Overhead, end.duration_since(start.max(node.end)));
}
if segment_start < segment_end {
totals.record(node.kind, segment_end.duration_since(segment_start));
if matches!(node.kind, WorkKind::AutoReview) {
totals.auto_review_overhead = totals.auto_review_overhead.and_then(|total| {
review_execution::overhead(&node.reviews, segment_start, segment_end)
.map(|overhead| total.saturating_add(overhead))
});
}
}
end = end.min(node.start);
path = &node.previous;
}
if start < end {
totals.record(WorkKind::Overhead, end.duration_since(start));
}
totals
}
}
// Long sequential turns must not recursively destroy one Arc per operation.
// into_inner consumes each reference atomically: concurrent releases cannot
// leave an Err(Arc) whose subsequent drop recursively destroys the next node.
impl Drop for Node {
fn drop(&mut self) {
let mut previous = self.previous.0.take();
while let Some(node) = previous {
let Some(mut node) = Arc::into_inner(node) else {
break;
};
previous = node.previous.0.take();
}
}
}
#[cfg(test)]
#[path = "critical_path_tests.rs"]
mod tests;